INNOVATIVE SYSTEMS

Big-O and BSB Box Support Brackets

Conduit and Box Support Plates

Conduit Transition Coupling

Conduit Trapeze Bracket

Cord Lock

Device Cover

Dual Wall Bracket

EZ Bar for T-Bar Ceiling

EZ Cable Ties

EZ On-Off Temporary
Panel Cover


Fixture Mounting

Hot Bend

Laser Line Gun

Qwik Duct Template

Roof Pipe Support

Top Slide

Wire Pulling Pal

 


For Stub ups in concrete slabs and decks. PATENT PENDING

Transition Couplings and reaming bits for sizes 1/2 thru 2 inch stub ups. Use PVC Elbows on entire job with no risk of damage. Save approximately 1 hour on each stub.

  • Cut PVC elbows flush to deck
  • Insert plastic protective plugs
  • As job progresses remove plugs and ream cut elbows to receive male PVC throat on either PVC to PVC, EMT or Rigid Conduit Transition Couplings.
  • Remove dirt and moisture.
  • Apply glue and insert male PVC throat of transition coupling into reamed PVC Elbow.
  • Insert screw or a PVC, EMT or Rigid Conduit or MC Cable connector into transition coupling to bring any type conduit or MC Cable above the slab.

Transition coupling are also ideal to repair PVC elbows that are damaged by other trades during the job. Repeat steps above.


Go Back to Innovative Products Main Page


Home | About us | Products | Catalogs | Links | Contact Us   Hosted & Designed by: Cyber-Construction, Inc.